Conservatory Build Update - Foundations

Old Victor our builder has been cracking on single handedly with our conservatory.

The foundations are now laid, the base wall built and he has now nearly completed the infill of hardcore so that sand followed by the waterproof membrane and finally the cement can be poured.

Also the waste pipe from the kitchen sink had to be rerouted and a new drain laid.

It's all coming together slowly but surely, considering he is doing this all on his own he is making really good progress.

Today the sand and membrane is laid all ready for concrete to be poured on Tuesday.



Still a lot of work to be done. One of the good things is that Vic has managed to source the same bricks as the house for the new brickwork. The house was built in 1979 so it will all look the same once completed.

Till later.....................